The binding risk is conversion speed: multi-year validation/qualification (especially automotive) can delay the step-change volumes that fix
unit economics. The second risk is value capture:
lidar hardware can be re-bid as a commodity, so the thesis requires software/services to become operationally critical (workflows, verification, SLAs). If that doesn’t happen fast enough, ongoing losses raise
dilution/financing risk and cap the equity
multiple.