Overall Risk Summary
This is a demand-light but execution-heavy story. The main question is no longer whether AI wants power-dense campuses; it is whether Hut 8 can turn signed value into energized, permitted, financed assets fast enough. Texas policy, tenant concentration, construction timing, and a still-heavy capital base are the key risks that can slow the shift from mining volatility to infrastructure cash flow.