The binding risks are (1) cost-of-capital and funding throughput for a very large build plan, (2) Florida regulatory posture/affordability constraints (especially into the post-2029 period), and (3) real-world speed limits:
interconnection queues, transmission build cycles, and storm/cyber reliability events that can trigger disallowances or higher compliance costs.